Chemical Cleaning of Canadian High Asphaltenic Bitumen at a SAGD Oil Sands Facility

high-asphaltenic-bitumen-before-and-after

Results Achieved

Plant fully decontaminated of bitumen residue

$350,000 saved by eliminating cutter stock requirement

Reduced mechanical cleaning costs and timelines by over 50%

Chemical profiles

FQE Solvent-ME

 

 

Very effective in dissolving high mole weight waxes and asphaltenes. As a water-based micro-emulsion cleaner, FQE Solvent-ME will water-wet the surface following rinsing with water.

Visit Asphaltene Control Page

Scope of Work

Group 1: Vessels

yellow-bulletSUCS Separator for WP 1
yellow-bulletSUCS K.O. Drum for WP 1
yellow-bulletSUCS Separator for WP 2
yellow-bulletSUCS K.O. Drum for WP 2
yellow-bulletInlet Surge Vessel

Group 2: Piping

yellow-bulletFlow Lines from WP-1
yellow-bulletFlow Lines from WP-2
yellow-bulletSUCS Piping at WP-1
yellow-bulletSUCS Piping at WP-2
yellow-bulletPE Lines from WP-1 to Super Module 1
yellow-bulletPE Lines from WP-1 to Super Module 2
yellow-bulletPE Lines from WP-2 to Super Module 1
yellow-bulletPE Lines from WP-2 to Super Module 2
yellow-bulletPE Lines from WP-2 to Super Module 3
yellow-bulletSGF Area Piping

Group 3: Exchangers

yellow-bullet6 Produced Emulsion / BFW Exchanger
yellow-bullet3 Produced Emulsion / Glycol Exchanger
yellow-bulletEjector Vapor Knock-out Drum

Group 4: Components

yellow-bulletDrop Out Spools

A SAGD oil sands facility, located in Northern Alberta used FQE® Solvent-ME to remove ultra-high viscosity bitumen residue from piping, vessels and pumps.

Oil sands are a mixture of bitumen, sand, water, and clay. The primary characteristic of bitumen is its inability to flow and therefore it cannot be produced using traditional means. Common production methods include open pit mining and steam assisted in-situ processes. The characteristics of bitumen found in Alberta ­­­— and with outside temperatures between -4°F to -40°F (-20°C to -40°C) — make it challenging for decontamination projects in the oil sands.

 

The client needed to effectively decontaminate a Steam Assisted Gravity Drainage (SAGD) facility for long-term preservation. The scope of work included two Well Pads (WPs) consisting of 37 well pairs and associated Produced Emulsion (PE) lines, five Well Pad Super Modules, two Start-Up Circulation Systems (SUCS) (a separator and knockout drum each), Steam Generation Facility Emulsion System (SGF), and approximately 1.2 miles (2 kilometer) of produced emulsion flow line that connects the well pads and the production facility.

 

After rigorous lab testing comparing several alternatives, FQE Solvent-ME was selected as the most effective and viable option. Developed to temporarily tie into water, FQE Solvent-ME eliminated the requirement for large volumes of expensive cutter stock (unavailable at the SAGD facility), and the need to conduct a final chemical degrease wash, as all surfaces were left water wet.

 

FQE Solvent-ME was applied using a variety of techniques:

 

1. Liquid Circulation: Process piping, produced emulsion line to the pads
2. High Pressure Jetting: Vessels and drums
3. Fill and Soak: Rotative equipment, including pump casings

 

The largest scope of work was a 1.2 mile (2 kilometer) produced emulsion line. The line was coupled with the parallel line flushed in a full flushing loop. Employing continuous heating and circulation of FQE Solvent-ME yielded residue free flow lines.

 

To put the chemical effectiveness in perspective, FQE Solvent-ME dissolved the high asphaltenic bitumen residue and brought it into a flowable liquid solution.

 

Summary of Results

 

Utilizing FQE Solvent-ME provided significant cost savings to the client since they did not have to procure a large amount of expensive cutter stock. This also diminished the need to conduct a final chemical degrease wash, as all surfaces were left water wet.

 

Upon completion of the scope, the client quality inspectors — utilizing thorough borescope inspections — accepted the chemical cleaning results. High viscosity bitumen residue on equipment, vessels and piping was eliminated and the mechanical asset integrity was maintained.

Download a PDF copy of this case history

Contact us to speak to one of our experts